Get in touch

  • Pump wedge - Air Bags
  • Pump wedge - Air Bags
  • Pump wedge - Air Bags
  • Pump wedge - Air Bags
  • Pump wedge - Air Bags
  • Pump wedge - Air Bags
  • Pump wedge - Air Bags
  • Pump wedge - Air Bags

Pump wedge - Air Bags

Description

1) Inflate the prodcut with hand force up to 160N

2) Put the product in the condition chamber at 20℃ for 2hours

3) Take out the product and place the load of 300kg in the center cover with a rigid plate for 1 hour. After test, No detachment, breakage and leakage shall be found

Certificate

  • ISO13485.jpg
  • ISO45001.jpg
  • DOC_-_-pressure_infusion_bag_page-0001.jpg
  • FDA.jpg

Inquiry